{"id":1162,"date":"2015-10-01T10:30:15","date_gmt":"2015-10-01T08:30:15","guid":{"rendered":"http:\/\/www.signum.be\/uncategorized\/oplevering-onderzoekslabo-voor-nanotechnologie-ku-leuven-2\/"},"modified":"2015-11-13T17:35:37","modified_gmt":"2015-11-13T16:35:37","slug":"completion-of-research-laboratory-for-nanotechnology","status":"publish","type":"post","link":"http:\/\/www.signum.be\/en\/news-and-announcements\/completion-of-research-laboratory-for-nanotechnology\/","title":{"rendered":"Completion of Corelab 1B, KU Leuven"},"content":{"rendered":"<p>The research laboratory for nanotechnology \u2018Corelab 1B\u2019 has been completed.<br \/>\nThe building has already been taken into use and enables several different teams to conduct research on nanotechnology.<br \/>\nThe project mainly consists of a laboratory building housing different laboratory areas and clean rooms with very strict vibration requirements, a technical building which is structurally completely separated from the laboratory and a volume containing offices and meeting rooms which connects with Corelab 1A.<br \/>\nThe building holds several research floors which meet with the strictest vibration criteria VC-E \u2018with an exceptional dynamic stability\u2019 for the sub 0.1 micron technology.<br \/>\n(in collaboration with Polo architects, CRC, Technum)<\/p>\n<p><a href=\"https:\/\/www.kuleuven.be\/english\/news\/2015\/new-research-facilities-for-chemistry-and-nanotechnology\">https:\/\/www.kuleuven.be\/english\/news\/2015\/new-research-facilities-for-chemistry-and-nanotechnology<\/a><\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=SDSd_mv_5mM\">https:\/\/www.youtube.com\/watch?v=SDSd_mv_5mM<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The research laboratory for nanotechnology \u2018Corelab 1B\u2019 has been completed. The building has already been taken into use and enables several different teams to conduct research on nanotechnology. The project mainly consists of a laboratory building housing different laboratory areas and clean rooms with very strict vibration requirements, a technical building which is structurally completely [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1119,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[30],"tags":[],"class_list":["post-1162","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-and-announcements"],"acf":[],"_links":{"self":[{"href":"http:\/\/www.signum.be\/en\/wp-json\/wp\/v2\/posts\/1162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.signum.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.signum.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.signum.be\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/www.signum.be\/en\/wp-json\/wp\/v2\/comments?post=1162"}],"version-history":[{"count":8,"href":"http:\/\/www.signum.be\/en\/wp-json\/wp\/v2\/posts\/1162\/revisions"}],"predecessor-version":[{"id":1229,"href":"http:\/\/www.signum.be\/en\/wp-json\/wp\/v2\/posts\/1162\/revisions\/1229"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.signum.be\/en\/wp-json\/wp\/v2\/media\/1119"}],"wp:attachment":[{"href":"http:\/\/www.signum.be\/en\/wp-json\/wp\/v2\/media?parent=1162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.signum.be\/en\/wp-json\/wp\/v2\/categories?post=1162"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.signum.be\/en\/wp-json\/wp\/v2\/tags?post=1162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}